Civil engineering services for redesign and widening of more than 2 miles of road in Brighton. Packages included right-of-way improvements, widening of Bromley Lane to a 6-lane divided roadway, adding a detached walk, extending storm sewer mains, retention ponds, curb and gutter, re-striping, design of a new segment of Tower Road, redesign of United Power’s parking lot, widening of 27th Street, topographic surveys, and landscaping.
Civil engineering services for redesign and widening of more than 2 miles of road in Brighton. Packages included right-of-way improvements, widening of Bromley Lane to a 6-lane divided roadway, adding a detached walk, extending storm sewer mains, retention ponds, curb and gutter, re-striping, design of a new segment of Tower Road, redesign of United Power’s parking lot, widening of 27th Street, topographic surveys, and landscaping.
Owner: City of Brighton
Completion: 2005
Construction Cost: $4M