Frank O’Mara Track & Field High Performance Center

University of Arkansas | Fayetteville, Arkansas

Martin/Martin provided structural engineering for the impressive 22,000 SF Frank O'Mara Track and Field High Performance Center, home of the University of Arkansas’ Track and Field program. What makes this Performance Center truly stand out is its unique placement at the south end of John McDonnell Field. Its design thoughtfully takes into consideration the building's surroundings, as the north end of the Performance Center boasts an impressive façade of continuous windows that allow for unobstructed views of the field. Inside, the Performance Center is equipped with top-notch facilities including locker rooms, a student lounge, hydrotherapy room, and a training and weight room, all aimed at providing a comprehensive training experience for Razorback Track and Field athletes. Connecting the different areas of the building, is a walkway that pays tribute to Razorback Track and Field alumni.

Frank O’Mara Track & Field High Performance Center

University of Arkansas | Fayetteville, Arkansas

Martin/Martin provided structural engineering for the impressive 22,000 SF Frank O'Mara Track and Field High Performance Center, home of the University of Arkansas’ Track and Field program. What makes this Performance Center truly stand out is its unique placement at the south end of John McDonnell Field. Its design thoughtfully takes into consideration the building's surroundings, as the north end of the Performance Center boasts an impressive façade of continuous windows that allow for unobstructed views of the field. Inside, the Performance Center is equipped with top-notch facilities including locker rooms, a student lounge, hydrotherapy room, and a training and weight room, all aimed at providing a comprehensive training experience for Razorback Track and Field athletes. Connecting the different areas of the building, is a walkway that pays tribute to Razorback Track and Field alumni.

Project Info

Owner: University of Arkansas
Designer: Hufft
Completion: 2021
Construction Cost: $15M

Services

Sector